# R3: Operator Centralization

**Risk:** Dominance by a small number of operators leading to correlated defaults and governance capture\
**Likelihood:** Moderate\
**Impact:** High

**Mitigation Measures:**

* Maximum **10% node share per operator** (enforced via registry)
* Minimum **3 geographic regions per operator**
* Incentives for smaller operators; governance cap at **3% per address**
* Target Nakamoto coefficient ≥ 8 with governance trigger

**Residual Risk:** Low–Moderate\
Strong structural safeguards; residual risk remains in cases of concealed beneficial ownership.


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://railquant.gitbook.io/quantarail/8.-risk-register/r3-operator-centralization.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
